Fleet Status Chart

This chart details the current status of our fleet and provides details during unexpected service disruptions. 

During the next few weeks as we mitigate some of the repairs listed below, all Golden Gate Ferries are on a temporary weekday schedule. Click the links below to view/download the temporary schedules by week.

Class Vessel Status Assign. Details
High-Speed Catamarans M.V. Del Norte red_dot Larkspur Out of Service

Shipyard, Regulatory Drydocking and engine overhauls.
M.S. Golden Gate green_dot Larkspur In Service
M.V. Mendocino green_dot Larkspur In Service
 M.V. Napa red_dot Larkspur Out of Service

Engine failure. Repairs in progress. Target return spring 2027.
Spaulding Class Vessels  M.S. Marin green_dot Angel Island, Sausalito, Tiburon In Service
 M.S. San Francisco red_dot Angel Island, Sausalito, Tiburon Out of Service

Shipyard, Regulatory Drydocking and engine overhauls.
M.S. Sonoma green_dot Angel Island, Sausalito, Tiburon In Service

Liwa Class Vessels

M.V. Liwa    

Projected to enter service in 2028

 

About our Fleet

Golden Gate Ferry launched service in the early 1970s with the original M.S. Golden Gate and a small fleet of monohull vessels. In the late 1990s and early 2000s, we expanded with high-speed aluminum catamarans that continue to serve our busy Larkspur–San Francisco route today. 

After decades of reliable service, many of our vessels have reached the end of their useful life and need to be replaced to meet modern emissions standards.

Over the next eight years, we’ll be rolling out a brand-new fleet of high speed, low-emission ferries, each built to the same design for better efficiency, reliability, and passenger experience. At their November 2025 meeting, the Board approved a contract to build the first two vessels in this long-term replacement program. 

The new M.V. Liwa-class design carries 500 passengers and is expected to enter service in 2028. These next-generation ferries will cut emissions by 80% and use 30% less power thanks to an improved hull design, while maintaining the fast, dependable service our riders count on. 

Along with the M.V. Liwa, the order includes a replacement for the M.V. Del Norte, built to the same specifications. These will be the first two vessels in our future fleet of seven to eight identical ferries, arriving through 2033 and creating a consistent, modern experience across Golden Gate Ferry.

 