Posted December 6, 2011
Bike Detour on Southeast End of Golden Gate Bridge, December 7 to December 9Utilities work related to the construction of the Golden Gate Pavilion in the Golden Gate Bridge Plaza requires the closure of the ramp in front of the Bridge Café. The closure will begin Wednesday 12/7 at 7am and continue through Friday 12/9 in the afternoon. As a result, bicyclists will be allowed to use the walkway through the construction area ONLY IF they WALK their bikes. Otherwise, cyclists will be required to follow the detour signs through the area as shown in this detour map (PDF). |


