Cost Savings and Cost Containment/Efficiency Initiatives
The following savings have been implemented by the District as part of an aggressive and on-going
effort to improve the efficiency and cost-effectiveness of District operations. These initiatives have reduced the
District¹s overall expenses in the current year and most will continue to do so in future years.
Description of Project
or Activity |
Description of Efficiency/Improvement |
|
Savings $ |
| Bus Operator overtime reduction. |
During a comparison 4-month period, Bus Operator "Held-In-Service" hours decreased from 12,732 hours to
4,975 hours (7,757 less). |
Estimated $300,000 per year savings in reduced "Held-In-Service" Overtime pay. |
| FasTrak reduced number of Toll Collectors from 44 full time and 4 part time to 40 full time |
Reduce Labor Costs |
$300,000 per year |
| Elimination of ticket position last year due to FasTrak |
Labor Savings |
$60,000 |
| Reduction of Bus runs |
Reduced the number of weekend bus runs by seven per Saturday and seven on Sunday |
This reduction equates to 2.8 fewer full time runs equaling $180,000 per year. |
| Bus Service Efficiency |
32 bus trips eliminated in the past 18 months due to traffic patterns and patronage trends. |
$360,000 per year |
| Reduction in Board Meetings |
Reduced number of Board meeting days by 50% |
$42,000 per year |
| The Engineering Department has recently staggered the start times for the District inspectors on our
construction projects. |
Reducing overtime costs |
$100,000 |
| New Ferry schedule implementation in September of 2001 |
Operating Efficiency
Backup vessel enables operation to significantly reduce the cost of alternate buses in the event of a scheduled or
unscheduled disruption in ferry service. |
$30,000 per year |
| The Engineering Department staff costs for the Phase 2 Seismic Retrofit Project have been eliminated from
the District's operating budget. |
These staff costs are now being reimbursed by state grant funds reducing the District's need for local
funds. |
$1 million |
| Kiosk/Shelter Advertising Revenue |
New program for increased revenues |
$180,000 per year |
| Outsourcing of engine rebuilds for coaches near to retirement. |
Rebuilt engines exempt from CARB regulations for exhaust retrofits. Reduction of one mechanic and one
machinist position |
Staff savings of $150,000
CARB exemption $70,000 per year |
| The last 6 bids were advertised more cost effectively. |
Reduction in Advertising Costs |
$18,200 |
| Proposing printing Transit ticket books from quarterly to bi-annually |
Cost savings |
$15,000 |
| Reorganization of duties in Auditor-Controller¹s Office |
Elimination of Deputy Auditor Controller position. |
$50,000 |
| Aggressive outreach to contracting community increased number of highly competitive bids for capital
project. |
Saved $100,000 below budgeted amount |
$100,000 on contract |
| Purchased reconditioned CHP patrol vehicle instead of new vehicle purchase |
Offset savings of buying new vehicle |
$20,000 |
| Negotiated "Special Shift" provisions into several union contracts allowing night work at straight-time pay
rates. |
Reduce amount of overtime expenditures |
$30,000 per year |
| On-going delayed purchases of new office furniture at Bus Division. |
At least nine offices in Bus Division are in need of new office furniture, similar in price and model to
the new furniture in most of District Division offices |
$27,000 |
| Trash collection equipment. |
Installed compactor for trash collection at D-1 |
$6,000 per year |
| Monitoring of wastewater from shop at D-1. |
Prevents operation of on-site wastewater treatment plant. Savings of staff time for Building Maintenance
Department |
$25,000 |
| Use radio phones. |
Range improved and batteries are rechargeable |
$6,000 per year. |
| Flooring material used on coaches. |
Easier to clean |
$25,000 per year |
| Use of concentrated chemicals with automated mixing. |
Controls waste and assures proper ratios of chemicals |
Savings of $2 per gallon for window cleaner. Unknown cost savings from potentially dangerous chemical
mixtures. |
| Frozen positions due to unanticipated revenue shortfall |
Cost Savings |
$669,000 |
| Increased reimbursement from existing insurance coverage |
Identified additional reimbursement available under the Hull and Machinery and Jones Act policies |
$300,000 |
| Oil lubricated bearings on coaches. |
Controls amounts of HAZMAT material production |
Reduction in amount of hazmat materials hauled off site. Cost at $400 per barrel. |
| TOTAL ESTIMATED SAVINGS |
|
$4 MILLION |
| Description of Project or Activity |
Description of Efficiency/Improvement |
| New Ferry schedule implementation in September of 2001 |
The three vessel schedule distributes major maintenance projects in a much more effective fashion resulting
with a reduction on the internal and external overtime. |
| Determine the real cost of high speed vessels vs. that of the medium speed vessels |
Create cost-efficient operation plan for future operating savings. |
| Efficient scheduling and flexible work assignments in Ferry Division. |
Less need for overtime and other employees. |
| Improvements for FasTrak violation collection |
Ensures timely revenue collection. |
| Purchased pipe coping machine for metal pipe resulting in labor saving. Work previously done by hand |
Labor efficiency, reduces work done by hand |
| Purchased automatic plasma cutter tracing system allowing multiple shaped objects to be cut at once
automatically. |
Labor efficiency, reduces work done by hand |
| Purchased several spider suspended scaffolds. |
Rigging time cut by 75% and rigging can be done without lane diversion. |
| In process of replacing light fixtures in offices with energy efficient T-8 fixtures |
Reduce utility bills |
| FasTrak Savings |
Save time for drivers, as there is less traffic at the Bridge, which reduces the cost of each bus trip. |
| Use of energy efficient lights and ballast in shop and bus parking lot. |
Less electricity usage and several rebates from manufacture and/or utility companies for possible rebates
up to 50% |
| Bus Maintenance Staff Efficiency |
More efficient use of staff in Maintenance Department using one of the smallest staff-to-vehicle ratios in
Bay Area transit. |
| Conversion of strike-print paycheck system to a laser-based system with pressure-seal form. |
Eliminate labor necessitated by running the paychecks through a check-signor, costs of envelopes, and
increases security features. |
| Conversion of employee required tax forms to laser-print form. |
Labor savings. |
| FMS automation |
Reduce costs of producing financial information, record keeping and payroll processing |
| Outsourced smog certification on all District vehicles |
Labor efficiency |
| Extended service intervals for District vehicles and equipment |
Cost Savings for less maintenance |
| Outsourced major machine work associated with travelling scaffold rehabilitation |
Cost-effective, reduce costs |
Financial Management Consultant:
Study underway with work program to be identified |
Will consolidate database and reduce data entry redundancies, improve management information. |
| Hire a new Work Comp TPA |
Improved claims management to close claims earlier and ultimately significantly reduce costs. |
Staff reorganizations:
1. Work Comp
2. Marketing and Communications
3. Planning
4. Human Resources |
1. Consolidated with single Manager.
2. Streamlined decision making, better budget control.
3a. Restructured to achieve more staff development and create support staff for higher level functions.
3b. Added a real estate position to better manage rail and property functions including generation of revenue
4a. Created an analyst position to better coordinate staff supervision and functions. Position frozen.
4b. Moved EEO functions from HR and created a higher visibility position reporting directly to DGM. |
| Streamlined and automated the toll violation review process |
Labor efficiency |
| Purchased more powerful rivet busters and _" drive impact wrenches. |
Increased efficiency on curb replacement project |
| Ferry Division developed a significantly improved loss-control program. |
Implemented new safety audit practices, enhanced safety committee activity and other initiatives. |
| Purchase tires on "as-needed" basis avoiding inventory costs |
Reduce Inventory Costs |
| Purchased engine diagnostic equipment |
Reduce external repair costs |
| Purchased line-sprayer greatly increasing efficiency of road and parking lot striping |
Labor efficiency |
| Establish preventive maintenance program for storm drains reducing overtime emergency call-outs for
flooding during heavy rains |
Preventative maintenance |
| Obtained factory certification for sky-climber and spider staging equipment |
Reduce factory repair costs |
| Closely coordinated work by numerous trades into single lane diversion. Results in far fewer diversions and
far more work completed per diversion |
Labor Efficiency |
Replaced incandescent signal lamps on lane gates and water bumpers with long life and energy efficient LED
lamps
Replaces faucets in public restrooms with low flow and auto shutoff resulting in significant water saving
Three old water heaters replaced with modern high efficiency units |
Preventative maintenance to reduce major repair costs and energy cost. |
| Bus division to improve use of outside service contractors. |
Effective control of janitorial and landscape services to maintain appearance. Savings of staff time @ 10
hrs monthly |
| On-site unit repair. |
Control of component quality |
| More labor available as a result of the new schedule to implement routine maintenance projects which were
previously left to biannual dry-docking projects. |
A reduction in the scope and complexity of dry-docking events and long-term improvement in the Division¹s
ability to perform routine maintenance |
| New aggressive search for alternate suppliers for routine stock items. |
More cost-efficient buying |
| Due to the fuel storage capacity at the Ferry Division our Purchasing Department has been carefully
monitoring the cost of fuel in order to execute fuel buys at opportune times |
Cost-efficient fuel buying |
| Elimination of outdated payroll reports. |
Labor efficiencies |
| Reducing check printing runs |
Labor Efficiencies |
| Cross-Training for staff |
Staff efficiencies |
| Extensive training initiatives and casual employee familiarization programs are under development including
the installation of a training facility at Larkspur Ferry Terminal |
Safety Improvements reducing operating costs |
| A comprehensive new set of operating manuals is near completion and this will provide a safer and more
predictable operating environment in Ferry Division. |
Improve safety.
Create predictability
Standardization |