Sidewalk to Larkspur Ferry Terminal Closed for the Final Phase of the Central Marin Ferry Connection Project
April 4 to May 11, 2016

Detour will be in place - Ferry customers will need to allow extra time to access terminal

The final phase of the Central Marin Ferry Connection project is getting underway on Monday, April 4, 2016. This involves the reconstruction of the sidewalk and various improvements along the south side of East Sir Francis Drake Blvd from the new pedestrian bridge to the Larkspur Ferry Terminal.

In order to complete this work, pedestrian and bicycle detours will be in place to facilitate travel (refer to map HERE or below). Detours will be in place from April 4 through Wednesday, May 11, 2016. Ferry customers may need to allow extra time to access terminal.

Depending on each traveler's destination, detour information follows:

  • FROM the Larkspur Ferry Terminal TO ALL points west OR Century Theater parking lot - Cross East Sir Francis Drake Blvd at the Ferry Terminal crosswalk, travel west along the sidewalk, use the new access ramp, and continue to the new pedestrian bridge or to the upper theater parking lot. If crossing the pedestrian bridge, a left at the bottom of the opposite new access ramp (on the other side of East Sir Francis Drake Blvd) will take you to Greenbrae. Refer to map HERE or below.
  • FROM Greenbrae and ALL points west TO the Larkspur Ferry Terminal OR Marin Country Mart - Use the new access ramp and new pedestrian bridge to cross East Sir Francis Drake Blvd. Continue down the opposite new access ramp to East Sir Francis Drake Blvd. A left at the bottom of the ramp will take you to the Marin Country Mart or to the crosswalk to the Ferry Terminal. Refer to map HERE or below.

For trip planning assistance, call 511 (say "Golden Gate Transit," then "operator" to bypass recorded messages)/TDD 711. The Golden Gate Customer Service Center is open weekdays, except holidays, from 7am to 6pm.

Central Marin Ferry Connection Project Sidewalk Construction Detour Map